Modular Cube Container Assembly Cell
This manually-loaded assembly cell consists of five stations to weigh the cube, cut a hole for the spout, inspect the cut, assemble the spout into the hole, leak test the cube, and offload the cube via collaborative robot. The robotic offload can be used in conjunction with the
Deflator/Stacker cell (as shown in the video) to finish the automated process or can be offloaded onto a conveyor for manual processing.